Tuesday, February 28, 2012

Bedroom Makeover, Before & After

These pictures of a client's spare bedroom are before the removal of the old carpet and the ceiling and walls being prepped for new paint colors.







Carpet removed and Crown Moulding installed prior to ceiling and wall prep.









After removing outlet covers, filling nail holes, sanding, and washing all surfaces, two coats of quality paint were applied to the ceiling, walls, moulding, door and window trim, and closet doors. New laminate flooring was installed along with new baseboards which also received two coats of trim paint.



 If your ready to make some changes to your home, please send me an email to set up a no obligation consultation.

Friday, February 17, 2012

Paver Patio

Area framed in with 4"X6" landscape timbers and soil compacted.







Base material and pavers being delivered.






After base gravel compaction, weed block, and sand leveled, pavers installed with edges cut to fit.



Filler sand and a final compaction complete the project.



Monday, February 13, 2012

Cedar Fence

A recent project was this cedar fence to accent the clients yard and hide the sight of the neighbors weeds growing beside their driveway each season.




The fence was built within code allowances to block the view of weeds while still providing street visibility for backing out of ones driveway.



Cedar post set in concrete, plumbed and aligned.



  Post cut to fence height with rails attached.
Fence boards attached and stain applied for great look and weather protection.